Shenzhen TV reported SHINHOP automatic battery pack assembly line
Shenzhen TV reporter visited one of SHINHOP's client's factory. SHINHOP energy storage battery PACK line is highly integrated, and the assembly of a 10 KWH finished battery takes only 5 minutes. Previously, it took 16 workers at least 30 minutes to complete. In the meanwhile, through the inspection of the SHINHOP automatic sorting machine, the battery voltage accuracy has been improved from the original 0.1 millivolt to 0.01 millivolt, and better products have been recognized by more customers.